Announcement on the Second Competitive Negotiation of the Transformation of Vehicle Control Room and Dust Network in Guangzhou Metro

Title: Guangzhou Metro Control Room and Dust Network Project Reconstruction Second Competitive Negotiation Announcement Tender No.: Announcement Date: March 12, 2009 Deadline: March 20, 2009 Tendering Agency: Guangzhou Metro Operation Headquarters : Guangdong Province-Guangzhou City Content: Guangzhou Metro Operation Business Headquarters is currently engaged in competitive negotiations on the installation of the intercom system (package material) and small system air conditioner structure and dust network transformation project for the hydraulic ladder and vehicle control room of Line 1 as follows:

I. Unit: Guangzhou Municipal Railway Corporation Headquarters

Address: Departure section of Guangzhou Metro Line 2 (behind the riverside garden of Xingang East Road, next to the entrance of South China Main Line)

Second, the project name: the installation of the intercom system of the hydraulic ladder and the vehicle control room of the No. 1 line (package material) and the structure of the air conditioner of the small system and the modification of the dust net

Third, the implementation site: the entire line of Line 1 and the B-side environmental control system of Huangsha Station.

Fourth, the project content:

1. Install intercom (including wiring and debugging) on ​​the hydraulic elevator of the subway station No. 1 station station to the platform, realize the intercom function of the hall call box and the vehicle control room of the hydraulic elevator, and realize the car of the hydraulic elevator. The intercom function inside and the car control room, and the emergency lighting inside the hydraulic elevator car. The contractor is responsible for all the work of equipment, materials procurement, construction, testing, and acceptance.

2. Renovate the air supply system of the B-side environmental control small system of Huangsha Station. After the transformation, the new air filtration effect of the small system should reach G3 level, and the air filtration effect of the station room equipment management room reaches F5 level.

V. Contracting method: total price

Sixth, the main amount of engineering

1. Installation of the hydraulic ladder and the vehicle control room intercom system on Line 1 (package material)

Table 1 Bill of quantities (installation, service)

No. Name Specification Model Unit Quantity Remarks
1 intercom system distribution box empty box, non-standard 16
210 internal intercom host (including regulated power supply)
3 anti-interference intercom extension station 95
4UPS0.8KVA table 16
5 two, three-hole socket 220V, 10A 16
6 communication bus cable RWP-500V 4×1.0 m 3900
7 communication bus cable RWP-500V 6×1.0 m 320
8 weak power cable RWP-500V 2 × 1.0 m 4220
9 hall door communication cable RWP-500V 4×1.0 m 445
10 car extensions follow the communication cable TWP-500V 4 × 1.0 m 1240
11 wires WDZC-BV-500V 2.5mm meters 310
12 galvanized steel pipe DN15 meters 9200
13 emergency lighting device (including energy-saving LED lights)

Table 2 Bill of quantities (spare parts, spare parts)

No. Name Specification Model Unit Quantity Remarks
1 intercom system distribution box empty box, non-standard 2
210 internal intercom host (including regulated power supply)
3 anti-interference intercom extension station 10
4UPS0.8KVA table 2
5 emergency lighting device (including energy-saving LED lights)

Table 3 Station allocation table

Station name Xilang Hangkou Huadiwan Fangcun Huangsha Changshou Road Chenjiatun West Gate number 33322233
Station name park former agricultural lecturer Martyrs Cemetery Dongshankou Yangshuo Sports West Road Sports Center Guangzhou East Railway Station number 32212232
Total 39

2, small system air conditioner structure and dust network transformation

Serial number item name unit of measure
1 Add 1 static pressure filter box at the fresh air inlet of the B-end of the Huangsha Station.
2 new air duct meter 10 extending RS-2-B and RS-1-B
3 air conditioning fresh air duct is connected to the static pressure filter box on the meter 10
4 Add manual air volume control valve on the newly connected air duct 4
5 The first stage pre-filter section (G1, metal mesh filter) is installed at the entrance of the new air static pressure filter box.
6Second stage filter section (G3, non-woven fabric) set 1 at the entrance of fresh air pressure filter box
7Update two fan units in the RS-1-B air conditioner 2
8 Add a new filter box at the entrance of the air conditioner cabinet 1
9 new medium-efficiency F5 filter section and filter set 1
10 Replace the original air conditioner new fan (including fan soft connection, reducer tube) table 1
11 Replace the original air conditioner new fan (including fan soft connection, reducer tube) table 1


Note: The specific workload is detailed in the competitive negotiation documents of this project.

7. The project sets the response limit price, which is subject to the written notice issued by the owner.

Eight, the qualified conditions for responding to qualifications:

(1) Responding to the per capita legal person status, holding the business license of the legal person issued by the administrative department for industry and commerce, operating according to the national law, providing a copy of the valid business license (with the annual inspection page of 2007) and affixing the official seal of the unit;

(2) The respondent has the qualifications for the professional contracting of mechanical and electrical equipment required to undertake the project, which is of Class III or above, and provides a copy of the valid qualification certificate and affixes the official seal of the unit;

(3) The respondent has the “Special Equipment Manufacturing, Installation, Renovation and Maintenance Permit” required to undertake the project, and provide a copy of the valid qualification certificate and affix the official seal of the unit;

(4) The performance certificate of the respondent who has completed the similar project since January 1, 2005 and has passed the construction quality (including the copy of the contract and the acceptance certificate and stamped with the official seal of the unit, the similar project refers to the above mentioned point (2) The electromechanical equipment installation professional contracted the elevator reconstruction project that can be undertaken by the third grade or above qualification).

(5) The project does not accept any form of consortium (the respondent must provide a written undertaking and affix the official seal of the unit).

8. The respondent qualification examination adopts the post-qualification method. The responding unit must submit the following information: (1 original, 1 copy, if the original and the copy are inconsistent, the original shall prevail)

Please bind the materials into a book in the following order

(1) A letter of response (the signature or signature of the legal representative or his authorized representative, and the official seal of the unit);

(2) responding to the power of attorney (if the legal representative does not personally sign the response document, he must submit an authorization letter from the legal representative);

(3) Prompt the required information according to the eighth point of this announcement, “Eligible Conditions for Responders”.

IX. Registration and submission of information: Guangzhou Metro Line 2 depot (behind the riverside garden of Xingang East Road, next to the entrance of South China Main Line), Room 612, 6th Floor, Operational Headquarters Complex Building (1st Building).

X. Registration and submission time: March 19-20, 2009

9:00 am to 11:30 am; afternoon: 14:00 to 16:00

11. The owner shall notify the owner of the competitive negotiation documents. Company Name: Contact Person: Mr. Li Tel: 020-83154501 E-mail: Fax: 020-84218737 Postal Code: Address: